Your question: How long does an environmental survey take?

How long does it take to do Phase 1 environmental site assessment?

Typically it takes two or three weeks to complete a Phase 1 site assessment. It’s an overview process, so there’s no need to allow time for in-depth scientific study.

What does a Phase 1 environmental report consist of?

While not part of ASTM requirements, Phase I ESA reports typically include a discussion of observed suspect asbestos containing materials (ACM), potential lead-based paint (LBP), and mold growth; as well as the potential for lead in drinking water and radon.

How long does a Phase 2 environmental take?

Generally, the Phase II ESA will take approximately four weeks.

How much does it cost to do an environmental assessment?

The cost of a Phase 1 assessment can be between $3,000 and $5,000, while Phase 2 assessments can range from $7,000 to $60,000, depending on the environmental issue.

How much does a Phase 1 ESA cost?

A Phase 1 Environmental Site Assessment cost varies depending on the location and characteristics of a property. As of 2021, the average Phase 1 Environmental price ranges between $1,800 and $3,500. And in rare instances, Phase 1 ESA prices can be as high as $6,000.

What triggers an environmental assessment?

An environmental assessment is a study required to establish all the impacts either positive or negative about one particular project. It will consist of technical evaluation, economic impact and social results that the project will bring.

IT IS AMAZING:  Why is it important that materials are recycled?

What is a Phase 3 environmental assessment?

Phase III assessments include additional intrusive testing and a plan to mitigate environmental issues based on the results of the previous assessments. During this phase, the size and source of the contamination will be characterized through methods such as installation of ground water monitoring wells.

How much does a Phase II cost?

Typically, a Phase II ESA can cost anywhere from $5,000 to well over $100,000.

How much does a Phase 2 environmental study cost?

The price of a Phase II Environmental Site Assessment can vary, depending on the aspects of a property. The Phase II Environmental Site Assessment cost is typically between $5,000 and $8,500 (for a standard commercial lot). Sometimes, Phase 2 ESAs can cost as much as $25,000.